This project was to design and build to suit the relocation of 500 staff to one central office. The challenge here was to coordinate with the mechanical installation in an open plan space with extremely high ceilings as the installation was 100% exposed. Working within the architect’s vision with the lighting also produced obstacles around glare control and illuminance on desk planes which were designed by our internal team.